Buildings

New Rome AS Stadium

  • LOCATION Rome, Italy
  • CLIENT MES Architects

Cantene developed the project with Gae Engineering srl for MES Architects (USA). Through a performance based approach, Cantene supported the Fire Protection Design developed by Gae. The activity was multidisciplinary involving the MEP department and the architects. Means of Egress, compliant to the Green Guide and Italian regulations was verified through a pedestrian analysis. CFD analyses was performed in singular points of the site for the ASET/RSET verifications. A CFD analysis was performed for the Ring Road, an internal road of the Stadium as reported below, in correspondence of kiosk in order to verify that people evacuating from stadium don’t enter in contact to the combustion products.